WP2 - Requirements
Work Package 2 Top Level Project
Hot Topics:
- We have the API Requirements Review currently in progress.
- 2 review sessions have been conducted. You find the results here:
- A new document has been started to concentrate on the API Requirements from a user point of view. Idea is to have a document which is useable for contract negotiations.
The revision of the document is started.
- There is still an open issue to make the location of the Alstom API Document clear.
Folder Organization Proposal for WP2
The folders are organized the following way in the requirement repository.
- Requirements : main requirement repository
- D2.1 --- State of the art : report on existing methodologies
- D2.2 --- State of the art : report on CENELEC
- D2.3 --- Definition of the overall process for the formal description of ETCS and the rail system it works on
- D2.4 --- Definition of the methods used to perform the formal description
- D2.5 --- Methods and tools benchmarking methodology
- D2.6-9 --- Set of requirements for the project (contains D2.6, D2.7, D2.8 and D2.9)
- D2.7-Technical_Appendix --- Description of the API
- MinutesOfMeetings : Self explanatory
- Workspace : All temporary documentation that does not fit anywhere
- Tools : Self explanatory
- Reference : Reference set of approved documents
The documents in progress should be found in Requirements/D2.x. After approval, the approved version is copied in the
Reference. In this reference repository, only the current applicable version in pdf format shall be found.