Closed reevik closed 4 years ago
The load patterns as in ramp-up phase, or throughout the load testing run needs to be synced by a central orchestration component, that is DLO, distributed load orchestrator.
Not in scope.
The load patterns as in ramp-up phase, or throughout the load testing run needs to be synced by a central orchestration component, that is DLO, distributed load orchestrator.