Open samsmithnz opened 1 year ago
Tier 6
Create AL production line: https://satisfactory-calculator.com/en/planners/production/index/json/%7B%22Desc_AluminumPlate_C%22%3A%2260%22%2C%22Desc_AluminumCasing_C%22%3A%22120%22%7D
Nuclear power plan
Products | Processing Level | Needed for end game |
---|---|---|
Iron products | ||
Iron Plate | 2 | 575 |
Iron Rod | 2 | 1350.5 |
Reinforced Iron Plate | 3 | 92.5 |
Rotor | 3 | 23 |
Modular Frame | 4 | 55 |
Heavy Modular Frame | 5 | 10 |
Concrete/Steel products | ||
Concrete | 1 | 150 |
Steel Beam | 2 | 326 |
Steel Pipe | 2 | 519 |
Encased Industrial Beam | 3 | 62 |
Copper/Plastic products | ||
Wire | 2 | 4004 |
Cable | 2 | 1510 |
Copper Sheet | 2 | 726 |
Black Powder | 1 | 1 |
Smokeless Powder | 2 | 1 |
Plastic | 1 | 1364 |
Circuit Board | 3 | 232 |
AI Limiter | 3 | 38 |
High-Speed Connector | 4 | 12 |
Computer | 4 | 18 |
Supercomputer | 5 | 4 |
Motor products | ||
Rubber | 1 | 75.5 |
Stator | 3 | 123 |
Motor | 4 | 9 |
Radio Control Unit | 5 | 4 |
Cooling System | 6 | 7 |
Turbo Motor | 7 | 1 |
AL Products | ||
Quickwire | 2 | 1432 |
Alclad Aluminum Sheet | 4 | 120 |
Aluminum Casing | 4 | 184 |
Battery | 5 | 20 |
Heat Sink | 5 | 24 |
Fused Modular Frame | 6 | 2 |
Quartz products | ||
Quartz Crystals | 1 | 36 |
Silica | 1 | 2057.5 |
Crystal Oscillator | 4 | 4 |
Uranium Products | ||
Electromagnetic Control Rod | 4 | 30 |
Plutonium Fuel Rod | 10 | 1 |
Elevator Parts | ||
Smart Plating | 4 | 5 |
Automated Wiring | 4 | 60 |
Versatile Framework | 5 | 10 |
Modular Engine | 5 | 2.5 |
Assembly Director System | 7 | 4 |
Adaptive Control Unit | 6 | 8 |
Magnetical Field Generator | 6 | 4 |
Thermal Propulsion Rocket | 8 | 1 |
Nuclear Pasta | 8 | 1 |
Power requirement: ~15009MW (6 Nuclear power generators at 2500MW each) 3,826 iron (64 normal nodes) 4,202 copper (71 normal nodes) 750 limestone (12.5 normal nodes) 1,816 coal (30.5 normal nodes) 2,160 Crude oil (18 normal nodes (120/p min is normal for oil)) 548 Caterium Ore (9.5 normal nodes) 386 bauxite (6.5 normal nodes) 225 Nitrogen Gas (4 normal nodes) 223 Raw Quartz (4 normal nodes) 50 Sulfur (1 normal node)
Final plan, with all items for nuclear power and final phase of the elevator
Phase 4 factory planning
References:
Part 1 - Chapter 1
Goal: Initially, the goal is to establish our base location and automate all production. Make sure you choose a spot with plenty of iron, and copper and limestone is close! This is looking ahead to the future where we want to setup our base of operations.
Setup new todos in game
Total power required: 223MW (8 biomass generators at 30MW each).
New power built: 240MW (8 biomass generators at 30MW each) The image below is trying to show the progression. Recommendation is two storage containers, one for wood, one for leaves, that each feed into their corresponding constructors - that then merges into a 3rd constructor to make the solid biofuel.
Plan to produce product: plan - Note that the diagram below shows meat instead of the biomass example I just shared above.
Resource nodes required:
Research to complete:
Special project: Start to plan for mall - need it to be 36 tiles wide (see next step for details)
Special project 2: Start to plan for Space Elevator. In the design below we need a large flat space with plenty of space for 4 factories to be build North, East, South, and West. As we get through each phase of the elevator, we build a new factory on top - with supporting train stations for each wing and level.
Factories needed: (All dumping into Hub)
When we can move to next step: When plan and research for Tiers 1 and 2 is complete.