-
## Summary:
Despite significant advancements in blockchain technology, native support for scheduling and executing functions at specific time intervals, including both one-time and repeating events, …
-
### The problem
I have a Samsung AE12BXYDEG/EU ASHP which is connected to SmartThings and from there to HA. Neither the official integration nor the HACS version (which I know is out of scope here) …
-
Define the core features: Based on the requirements you mentioned, you could define core features such as a dashboard for managers, scheduling tools, time and attendance management, employee profiles …
-
### Expected Behavior
@Micronauttest tests never hang indefinitely
### Actual Behaviour
When running our tests via gradle on the ubuntu-latest github runner, the testing can occassionally sto…
-
[//]: # (Copyright Siemens AG, 2021. Part of the SW360 Portal Project)
[//]: # (This program and the accompanying materials are made)
[//]: # (available under the terms of the Eclipse Public License…
-
## Overview
- This project tracks the work needed to This proposal describes a plan to shift the ongoing development and maintenance for the [Harvard Peer Pre-Review Program](https://pre-review.iq.ha…
-
**Setup**
Rancher version:v2.8-head
Browser type & version: Chrome Version 124.0.6367.78
Harvester Version: v1.3.0
To Reproduce
1. Set up vGPU profiles (multiple) in Harvester
2. Import Harv…
-
## Details
A change management plan is a structured approach and document that outlines the strategies, steps, and activities required to effectively manage and implement a significant change within …
-
##### ISSUE TYPE
- Feature Idea
##### COMPONENT NAME
- API
- UI
##### SUMMARY
Schedules can have an end-by date, or an "end after 20 runs" configuration.
It may be useful to have a p…
-
Generated from #826
Establish how long content needs to be retained, and in what form, even after it is no longer published.
Questions to be answered during scoping:
- What are the legal requireme…