-
I am trying to fix a model variable to run a base case scenario, but the value still varies. The variable I am fixing is M at parameter m0. Is there a different way I should be fixing the variable? Th…
-
## Description of the issue
From oeo-dev 82.
This builds on #1510.
## Ideas of solution
Which quantity values are actually quantity values? ToDo: add axioms
- area value
- coefficient o…
-
**Is your feature request related to a problem? Please describe.**
Energy Rates are needed to do the calculations. Currently, the UK market is supported.
We could quickly implement Energi Data Ser…
-
Change lookup for electricity emission factor to have look up for year and market/location
get data from VERIFI
-
When looking for an inspiration to https://h2-network.streamlit.app/, it looks like pypsa-earth spatial plots could be more meaningful if we do the following:
- [ ] adjust appearance of the points;
…
-
Welcome to our series of case studies about companies using Elixir in production. [See all](https://elixir-lang.org/cases.html) cases we have published so far.
[SparkMeter](https://www.sparkmeter.i…
-
In the current status there are only energy amounts analysed in the model. But in my opinion, it would be really useful to analyse also the prices of energy in the specific times, cause we already hav…
-
I am not familiar with electricity markets but if they are semi-strong efficient (= all know information is in the prices) then market prices will reflect already all other inputs to the model. In my …
-
@xiaoya-li @YuxianMeng @littlesulley after train, i use mrc-for-flat-nested-ner/scripts/mrc_ner/nested_inference.sh to do inference , but the start is always 0, ACE04 log are as follows:
*=*=*=*=*=*=…
-
In the not too distant future we will see 15 minutes Market Time Unit instead of 60 minutes in the electricity market. That means price arrays with four times as many prices, one price per 15 minutes …