-
**Feature description:**
We want to model hybrid wind+solar timeseries power generation with curtailed electricity going to an electrolyzer. We then want to know LCOE and LCOH for the hybrid plant, w…
-
The newly added fields for the ontology reference were tested and need to be improved.
### **is_about**
- [x] rename to isAbout
- [x] change value to a list
### **value_reference**
- [x]…
Ludee updated
2 years ago
-
I wanted FAST to connect to SIMULINK, but when USING DOF, SIMULINK reported the following error:
FAST_Solution:CalcOutputs_And_SolveForInputs:SolveOption2:AD_CalcOutput:BEMT_CalcOutput(node 5, blade …
-
### TODO
Follow [the description in the wiki](https://github.com/equinor/energyvision/wiki/satellite-sites) to create the Japanese satellite page
### Acceptance criteria
- An Japanese version of San…
-
Hi,
I wanted to verify how many sites are providing the data for a region. so I used the site count api call and got following response. Does this mean the India data has only one site? or does thi…
-
Hi, I am trying to run 5MW OC3 Spar with my own input data. I have changed the run time within the FST file from 60s to 900s, and I am getting this error message. Any help would be greatly appreciated…
-
@ConnectedSystems, @veroniquelago, @BarbaraRobson, @Rosejoycrocker
Hi All,
I’m exploring Brick connectivity patterns for different years. I’m seeing a few things that potentially signal misali…
-
Start developing and uploading datasets which are pertinent to future energy scenarios. Currently focus is on doing this for the National Grid Future Energy Scenarios 2021 (FES2021).
-
NREL Annual Technology Baseline has a range of different cost groups for different resources with short abbreviations that need to be referenced by PowerGenome users when defining new build options. F…
-
## Processed data set: Bundesnetzagentur - Marktstammdatenregister
* 2019-01-31 MaStR is online
* 2019-02-07 Start review
* 2019-03-01 Inofficial release data v1.1
Link to metadata: [supply.bn…
Ludee updated
2 years ago