I am struggling to get any import work from a csv file. After starting an
import by selecting a file nothing happens.
I've tried tinkering with the csv file in excel but it does not work.How do…
-
```
What steps will reproduce the problem?
1.Install GanttProject 2.6 RC on Windows 7
2.Create a task
3.Open the task properties and select milestone
4.Click okay and return to the main screen
5.The t…
-
```
In the current export functions of GanttProject 2.0.10 (and Praha 428) its not
possible to select which fields are exported (or printed) in the
taskinformationcolumns.
It could be very useful t…
-
```
1. Open HouseBuildingSample project and switch to Resource view.
2. Select any task under "Jack House" node and press arrow up (or arrow
down) button above the resource table.
Expected: task mov…
-
```
Copied from the bug tracker on SourceForge:
https://sourceforge.net/tracker/index.php?func=detail&aid=1166540&group_id=72728
&atid=535427
https://sourceforge.net/tracker/?func=detail&atid=535427&…
-
```
We can add delay for links between predecessors and successors. This is ok, but
it would be much better if 'Delay' can be shown on Columns so that it can be
easily changed. Currently I have to g…
-
```
I want to enlarge the width of a column, but in doing so it only shrinks the
immediate adjacent column. If I want it to be wider still then I must go and
manually reduce additional columns to t…
-
```
> What steps will reproduce the problem?
1. Input an FTP server address, login, password in Settings, check = fine?
connection is made (shown in network traffic monitor).
2. Export PNG image, sel…
-
```
1.Change the colour of a task (e.g to #8CCE90)
2.Close task
3.Open task and change colour
Expected:
#8CCE90 should be selected (and corresponding red,green,blue)
Actual:
#f9f9f8 (white)
This is…
-
```
What steps will reproduce the problem?
1.Create a new project. Switch off weekends before creating any task.
2.Add a single task extending over a date which will be declared as a holiday
day (se…