-
## Description of the issue
Currently in the ontology we have `Charging` which is the process of transmitting energy from the grid to a battery. This is insufficient to describe particulars associa…
-
### Describe the bug
Hallo,
seit dem Update 0.130.0 startet die Ladung nicht mehr.
Habe auch schon 0.130.3 getestet.
- charge power: not available
- charger out of sync: expected enabled, g…
-
### Describe the bug
After you've conected two vehicles by a jumper cables, you still retain a connected cable, in addition to the cable that's now built into the vehicles (so the cable has been du…
-
### Overview
Occupancy grids are a grid of the space around the vehicle that show spaces that the vehicle can move in and spaces the vehicle cannot move in. We have 2 occupancy grids produced by our s…
-
**Describe the issue**
As a vehicle starts burning fuel, the fuel disappears from the fuel slot. Once the fuel is fully burnt, the burnt result appears in the burned fuel slot. If the vehicle is deco…
-
### Describe the bug
When Autosaving or Quicksaving any Wind Turbines, connected to your grid by Outdoor Extension Cables, but are not within your currently active tile area get discconected from the…
-
### Checklist
- [X] I've read the [contribution guidelines](https://github.com/autowarefoundation/autoware/blob/main/CONTRIBUTING.md).
- [X] I've searched other issues and no duplicate issues were fo…
-
Dear Hatem-darweedh ....i have followed instruction from your autowae universe carla bridge tutorial 1 and 2....along with that i have followed instruction from [https://github.com/ZATiTech/open_plann…
-
### Describe the bug
Not totally sure if bug or my situation is really an edge case.
I have : go-e 3P charger, 1p AC charged Nissan Leaf 2018, Deye 3p Hybrid 8kW (3kW AC output per phase), 7,5kW…
-
## Description of the issue
The current configuration for vehicle charging/tanking infrastructure is too coarse. From trying to annotate a charging station dataset we noticed some weak points.
-…