issues
search
xpdAcq
/
mission-control
Releases, Installers, Specs, and more!
0
stars
4
forks
source link
issues
Newest
Newest
Most commented
Recently updated
Oldest
Least commented
Least recently updated
Automated sample finding for robot TEM scans
#127
CJ-Wright
opened
6 years ago
14
Ship bib file for software running at beamline
#126
CJ-Wright
opened
6 years ago
4
make repo of plan spinets
#125
CJ-Wright
closed
2 years ago
2
have swap on global as context manager
#124
CJ-Wright
closed
6 years ago
3
use hints for saving
#123
CJ-Wright
closed
5 years ago
1
UC for XPD-D compress experiments
#122
sbillinge
opened
6 years ago
5
way to bypass calibration in xpdAn
#121
CJ-Wright
closed
6 years ago
3
extra long delay when running tseries
#120
CJ-Wright
opened
6 years ago
7
Run robot with type 2 sample holder
#119
dooryhee
closed
6 years ago
18
after change frame_acq_time to 1sec, xrun(0, 5), 60sec scan finished in 6 sec.
#118
adelezh
opened
6 years ago
9
Instructions for running locally
#117
CJ-Wright
opened
6 years ago
1
integrate shutter control in Tramp and Tlist
#116
dooryhee
closed
6 years ago
7
Linkam temperature controller
#115
dooryhee
closed
6 years ago
1
Boilerplate rever things
#114
CJ-Wright
opened
6 years ago
1
Cleave configuration from Acq/An and centralize it
#113
CJ-Wright
closed
6 years ago
0
Fix changelog template
#112
CJ-Wright
closed
6 years ago
1
Beamline specific docs
#111
CJ-Wright
opened
6 years ago
4
Referencing sample in robot workflow
#110
chiahaoliu
opened
6 years ago
4
Flexibility of specifying ScanPlan and experiment type in the config file
#109
chiahaoliu
opened
6 years ago
3
Current version of _end_beamtime()
#108
sghose
opened
6 years ago
1
Slit and Crystal bending optimization
#107
CJ-Wright
opened
6 years ago
1
Automate Refinements
#106
CJ-Wright
opened
6 years ago
1
Perform slit scans to detemine Horizontal/Vertical beam intensity profiles.
#105
CJ-Wright
opened
6 years ago
0
Quantitatively maximize the flux using Io from the beamstop.
#104
CJ-Wright
opened
6 years ago
0
Apply OCM pneumatic filters, and precisely align the beam stopper using the detector.
#103
CJ-Wright
opened
6 years ago
0
Align the detector 1 beamstop using the signal from the embedded I0 monitor.
#102
CJ-Wright
opened
6 years ago
0
Write out detector commissioning measurements
#101
CJ-Wright
opened
6 years ago
1
Harvest Technical commissioning UCs from Milinda's planning doc
#100
sbillinge
closed
6 years ago
0
send prioritized list of PVs to DAMA for Ophyd objects
#99
sbillinge
opened
6 years ago
0
Ophyd Objects for TC
#98
CJ-Wright
closed
6 years ago
1
Include changelogs in docs
#97
CJ-Wright
closed
6 years ago
0
Template configuration information in docs
#96
CJ-Wright
closed
6 years ago
6
auto background scaling
#95
CJ-Wright
opened
6 years ago
1
Cf nsls update
#94
CJ-Wright
closed
6 years ago
0
Beam Shutter suspender and warning
#93
CJ-Wright
opened
6 years ago
6
Plots without background
#92
CJ-Wright
opened
6 years ago
2
ENH: separate beamline specific code
#91
CJ-Wright
closed
6 years ago
0
update release stub
#90
CJ-Wright
closed
6 years ago
0
ENH: add release stub
#89
CJ-Wright
closed
6 years ago
0
Standardize release notes
#88
CJ-Wright
closed
6 years ago
0
ENH: add anaconda info
#87
CJ-Wright
closed
6 years ago
1
Standardize CI system
#86
CJ-Wright
opened
6 years ago
2
ENH: table of CI results
#85
CJ-Wright
closed
6 years ago
4
TST: toward full test coverage
#84
CJ-Wright
opened
6 years ago
0
Separate processes for analysis and plotting
#83
CJ-Wright
closed
5 years ago
3
Sample Alignment
#82
CJ-Wright
opened
6 years ago
5
Put filters into metadata
#81
CJ-Wright
closed
6 years ago
0
Throw in filters automatically for Ni
#80
CJ-Wright
opened
6 years ago
2
DOC: build on tags
#79
CJ-Wright
closed
2 years ago
2
ENH: No masking
#78
CJ-Wright
closed
6 years ago
4
Previous
Next