-
When providing user defined regional loads via the settings:
```yaml
regional_load_fn: regional_load_profiles.csv #Externally provide load data
regional_load_source: USER
```
I get an error:
```…
NLaws updated
2 weeks ago
-
For rail electrification, the EPS currently includes the cost differences in the vehicles (trains / rolling stock), but it has no estimate of the costs to electrify the rail lines. This would be the …
-
Currently, additional demand response potential is tied to fixed input data. This creates an issue because in high electrification scenarios, demand response potential would be much higher than in a B…
-
### What happened?
Once a path is created (origin and destination), the power restriction selector identifies the "electrification change points" to create intervals in the selector.
Here, on a Par…
-
Hi, thanks for creating openrailwaymap.
I have noticed an issue in the new electrification layer. Track with 3rd rail is not rendered correctly.
I am not sure if it is an incorrect tag or just a …
-
### What happened?
There is a piece of track where no electrification is shown but which is in fact electrified:
![image](https://github.com/osrd-project/osrd/assets/47494402/51299495-fb3a-4b54-9a84…
-
The disputed area between Sudan and S. Sudan are both a dashed and a solid line- should only be dashed. The same goes for the border between Morocco and Western Sahara.
![Capture](https://user-im…
-
@ibanaressanchez @robinslburgess **& any others interested in this topic**
Following from last week's discussion let me share these two documents:
* [van Gevelt (2014) - Rural electrification and …
-
As explained [here](https://github.com/developmentseed/gep-coordination/issues/24) by @alekordESA, features with "99" electrification type in intermediate years should not be displayed or summarized o…
-
The following is not a target audience. Need to be more specific with who the target audience is.
2. Consolidating electrification base data and electrification investment scenarios for easy brows…